| Tuf-Tite Corporation Drainage and Septic Products 500 Capital Drive Lake Zurich, Illinois 60047 800-382-7009 847-550-1011 Fax: 847-550-8004 e-mail us |
![]() |
|||||||
| CLICK HERE for the full-size, printable PDF file of this literature. | ||||||||
![]() |
![]() |
|||||||
| 4-Hole Distribution Box
Tough Problem: Providing a simple, reliable, and permanent means for dividing septic tank effluent flow. TUF-TITE Solution: A strong, stable, permanent, non-corrosive Tuf-Tite Distribution Box, with a Tuf-Tite Speed Leveler in each outlet. Tuf-Tite® Snap-in pipe seals Theyre permanent |
Injection molded. Exceptionally strong. HDPE is non-corrosive in a septic environment. Patented snap-in pipe seals simplify installation. Interlocking Lid. Heavy-duty HDPE Lid is ribbed for added strength and rigidity. Slotted sides interlock on the Distribution Box to assure a tight fit. The 4HD2 Distribution Box comes complete with a Regular Lid or an Inspection Port Lid, and 5 snap-in fittings of your choice. Model B1 Riser. For series B1 Box. Stackable HDPE Risers extend to grade in 6 increments. Accept 11 x 11 lids and grates. INSTALLATION IS JUST THIS SIMPLE 1. Position the Distribution Box on level virgin soil. Do not place box on a concrete slab. 2. Install the inlet pipe and outlet pipes. Be sure the bottoms of all pipes rest on virgin soil. 3. Level the Distribution Box and all pipes as needed. 4. Backfill the pipes to within two feet of the Distribution Box. Recheck the level of the box, then backfill up to the top lid ridge. 5. Install and adjust Tuf-Tite Speed Levelers. 6. Place lid on the Distribution Box and finish backfilling. |
|||||||